Engineering
- Verify Validation of Basic Design
- Detail of All Engineering
Procurement
- Long Lead Item List.
- Non Long Lead Item List
Construction
- Hot Tap Operation 16” x 16” x 12”
Engineering
Verify Validation of Basic Design
Detail of All Engineering
Procurement
Long Lead Item List.
Non Long Lead Item List
Construction
Gas Pipeline
Metering Station
Cathodic Station
SCADA RTU
Commissioning and Start Up
Engineering
Detail of All Engineering
Procurement
SUPPLY REPAIR SLEEV
Construction
PIPE WELDING REPAIR SLEEV
NDT WORK
SCOPE OF SUPPLY
Engineering
- Verify Validation of Basic Design
- Detail of All Engineering
Procurement
- Long Lead Item List.
- Non Long Lead Item List
Construction
- Gas Pipeline
- Metering Station
- Cathodic Station
- SCADA RTU
Commissioning and Start Up
Contact value 90 m.
Status : Under Construction
SCOPE OF WORK
1. Approximately 0.1 km of 8” dia. transmission branch pipeline to transport 18 MMSCFD of gas to Berkprai new Metering and Regulating Facility station.
2. Tie-in Facilities by Hot Tapping at PTT’s Ratchaburi -Wangnoi Gas Pipeline at location for 15°30'126.028"N 59°23'90.757"E, around KP 35+150.
The Metering & Regulating.
- 1 x Control Room Building ( 5 x 10 m Approx. )
- 1 x Metering Shelter
- 1 x Vent Stack
- 2 x Gas Filter
- 2 x Pressure Reducing and Regulating and Control Facilities with Interface to SCADA
- 2 x Gas/Liquid filter Separator and facilities including PLC Auto-drain (hardware and software license)
- 2 x Turbine Meter and Accessories
3. Cathodic Protection System (Impressed Current for pipelines and facilities including provision for mitigating effects from the high voltage power lines and lightning
4. SCADA, RTU and FOTE and Communication system to support all new facilities installed.
All Mechanical , support , civil work etc.
Engineering
Procurement
Construction and Installation
หน่วยการเตรียมวัตถุดิบ
หน่วยการหมัก
หน่วยการกลั่น
หน่วยสาธารณูปโภค
ส่วนอื่นๆ
Commissioning and Start Up
Status : Under Construction
Engineering
- Design Line Hot tap and Stopple Fitting
- Calculation Hot and Line stopple Fitting
Procurement ( Supply Hot tap and Stopple Fitting
- 28” 600# Split Tee Line stop = 4 set.
- 28” x 24” Split Tee Bypass fitting = 4 set.
- 28” x 8” Split Tee Bypass fitting = 2 set.
- 28” x 6” Split Tee Bypass fitting = 2 set.
Hot tap and Stopple
- 28” x 28” 600# Split Tee Line stop = 4 set.
- 28” x 24” Split Tee Bypass fitting = 4 set.
- 28” x 8” Split Tee Bypass fitting = 2 set.
- 28” x 6” Split Tee Bypass fitting = 2 set.
Engineering
- Verify Validation of Basic Design
- Detail of All Engineering
Procurement
- Long Lead Item List.
- Non Long Lead Item List
Construction
- Gas Pipeline
- Metering Station
- Cathodic Station
- SCADA RTU
Commissioning and Start Up
Contact value 22 m.
Status : Under Construction
Engineering
Procurement
Construction and Installation
Commissioning and Start Up
Status : Under Construction
1.Engineering
Design Line Hottap and Stopple Fitting
Calculation Hottap and Line stopple Fitting
2.Procurement
Saddle Fitting Type 6” Schedule 120# Flange class 900#RF
Material Certification 3.1
Standard documentation (Material test records/NDE/RT inspection reports / GA drawing and branch reinforcement calculation sheets/ certificate of compliance )
Local Fabricated Reinforcement Pad size 6” with calculation and Certification
3.Service Work
Hottap-on Non piggable pipeline 24”
Mob and Demob
Welding Temper bead technique for Branch Line 24”x6”
List of pipelines to be inspected
Pathumthani-Phayathai (SP71-MR Rangsit) 12” Length 5.2 km
Service Work
Modification Service : Temporary Launcher
Reinstalled temporary launcher and re-modification pipeline
Pre-inspection Service : cleaning pig / gauging or dummy pig
Inspection Service
Geometry inspection by Multichannel Caliper Tool
Inspection run per specified pipeline section
Tools that can inspect pipelines with Nitrogen media, the result accuracy are preferred.